Idea Statica
Acél
Csomópont tervezés
Connection Library
Member alkalmazás
BIM munkafolyamatok acél projektekhez
Beton
Fal és részletek tervezése
Keresztmetszet tervezés
Elemek tervezése
BIM munkafolyamatok beton projektekhez
BIM
Támogatott BIM kapcsolatok
Checkbot
Viewer
Támogatási központ
Támogatási központ
E-learning és diploma
Személyes képzés
Letöltések és licencelés
Árak
Standard felhasználók
Nemzetközi vállalatok
Diákok és oktatók
Cég
Kapcsolat
Blog
Kutatások és fejlesztések
Engedélyezett viszonteladók
14 napos próbaverzió
Case studiesFacade connections at Midland Metropolitan hospital, UK
Facade connections at Midland Metropolitan hospital, UK
Connection designSteelConnection

Facade connections at Midland Metropolitan hospital, UK

Egyesült Királyság

In this showcase, we are presenting an example of connections of an interior steel structure with an unusual offset arrangement for the cross bracing required by the team of architects of the Midland Metropolitan Hospital near Birmingham, United Kingdom.

This article is also available in

ENCSDEESFRITPTNLHURO

The Midland Metropolitan Hospital  (in 2020 still currently under construction) is one of the projects where NOVUM Structures, an international specialty contractor for innovative architectural structures, is involved in. This project is a new acute general hospital being built on a 16 acres site in Grove Lane at Smethwick near Birmingham. The hospital was designed by a team led by HKS and including Edward Williams Architects and Sonnemann Toon Architects. 

Midlands Metropolitan Hospital flythrough  video

Facade connections

Visualization of the finished project. 

Steel structure under construction.

The connection is part of an interior steel structure and has an unusual offset arrangement for the cross bracing that was an architectural requirement. The bracings are actually MacAlloy tension bars and were modeled as solid bars and double fin plates to simulate the geometry of the MacAlloys end forks.

The three beams are connected with the column through stubs, while the cross-shaped plate that connects the tension bars is welded to the column with a CHS section.

Thanks to the unique approach of IDEA StatiCa, this very complex connection could be analyzed as a whole, taking into account the interaction of all internal parts and loading, which leads to a very precise simulation of the joint and analysis/checks results.

The complete workflow of modeling, loading, and checking of this connection, has been presented in one of the Connection Wednesdays webinar series on 26/7/2017. You can watch the webinar recording: 

Facade connections at Midland Metropolitan hospital, UK

Gallery

1 / 6

Gallery

1 / 6
Gallery image 1
Gallery image 2
Gallery image 3
Gallery image 4
Gallery image 5
Gallery image 6